Battery Trip Unit
Standard (24V - 50V)

An appropriate means of isolating the AC supply external to the enclosed will be needed for compliance with BS7671 (IEE Regulations)

Battery Trip Unit
Battery Trip Unit Thumbnail

Battery Trip Unit Standard (24V - 50V)

Raise an enquiry with us to recieve your custom quote today.

Tick icon

99 in stock

Tick icon

Delivery from: 2 weeks

Tick icon

Quality approval

Tick icon

Professional installation available

Description

Applications

Please note that due to the importance of maintaining the tripping output, an on/off switch is not provided as standard with these units.

An appropriate means of isolating the AC supply external to the enclosure will be needed for compliance with BS7671 (IEE Regulations)

The CRB range of tripping battery units provides a DC supply in electrical substations and switch rooms for the tripping and closing of circuit breakers.

They also find applications in order stand by situations where an occasional high current load needs to be supplied for a relatively short time.

The units are highly reliable and utilise maintenance-free sealed lead acid batteries, which give high discharge currents, long life, and freedom from the plate corrosion failures associated with some other battery types.

  • Sealed Lead Acid Battery

  • High Performance

  • Low Maintenance

  • High Quality

  • CE Marked

The batteries are tolerant of accidental over-discharge without damage.

These units are quick and easy to install because they are delivered with the batteries already fitted and connected.

Only mains 230V and output 30Vdc connections need to be made.

All models are suitable for supplying intermittent tripping or closing loads within the peak current rating quoted.

The unit is fitted with a charge-fail alarm relay as standard.

A relay of alarm is available for connection to a remote monitoring system

Additional alarms may be fitted to the continuous load models as extra-cost options.

High voltage, low voltage, and DC earth fault functions are available.

A test facility is provided by means of a voltmeter and dummy load so that the condition of the batteries can be periodically monitored.